Amazon Offices

Project description

Installation of electricity, lighting and power, telephone network, public address system, fire detection and extinction, air conditioning and heating and plumbing.

  • Maximum admissible power: 1.360kw
  • Maximum installed power: 1.456kw
  • Central heat production: 1.543kw
  • Cold production plant: 1.378kw.
  • Client: DRAGADOS
Project details
  • Economic volume: 3.500.000 €
  • Year of realization: 2017
  • Surface: 14.000 m²

Contact


Send us your message through the following form and we will respond as soon as possible.

See Privacy Policy and Legal Notice
Scroll to Top