Law School

Project description

Comprehensive facilities in 4 buildings for the Faculty of Law of the UB.
Installation of Medium and Low Voltage, lighting and power, telephone network, public address system, fire detection and extinction, air conditioning and heating, plumbing and gas.

  • Power in AT: 2×1.600KVA
  • Maximum admissible power: 2.720 kw
  • Useful heat generation power: 650 kw
  • Useful Power Cold Generation: 1.536 kw
  • Client: UTE ACCIONA-ACSA
  • Final client: UB
Project details
  • Economic volume: 3.000.000 €
  • Year of realization: 2016
  • Surface: 17.639 m2

Contact


Send us your message through the following form and we will respond as soon as possible.

See Privacy Policy and Legal Notice
Scroll to Top