Building C Campus Diagonal Besos UPC

Project description

Installation of electricity, low and medium power, lighting and power, voice and data, telephone, public address system, fire protection and detection, air conditioning with Districlima, ventilation, control, natural gas, compressed air, vacuum, pneumatic waste collection, network of AFS and ACS water, pure water network for laboratories.

Project details
  • Economic volume: 2.500.000€
  • Year of realization: 2015
  • Surface: 8.000 m2

Contact


Send us your message through the following form and we will respond as soon as possible.

See Privacy Policy and Legal Notice
Scroll to Top